Difference between revisions of "PerkinElmer Sprecturm2000 FT-IR (FT-IR-1)"

From Help Wiki
(EPROM configuration file)
Line 20: Line 20:
 
* The [PCI] computer controller board doens't automatically put the instrument into ''ready'' mode. Apparently, the [http://en.wikipedia.org/wiki/Industry_Standard_Architecture ISA] controller board does interact with the instrument to initialize it and put it into ''ready'' mode.   
 
* The [PCI] computer controller board doens't automatically put the instrument into ''ready'' mode. Apparently, the [http://en.wikipedia.org/wiki/Industry_Standard_Architecture ISA] controller board does interact with the instrument to initialize it and put it into ''ready'' mode.   
 
* The instrument should be left on so the internal heater can keep the inside of the instrument dry. Internal moisture will degrade the salt based piece inside the instrument.
 
* The instrument should be left on so the internal heater can keep the inside of the instrument dry. Internal moisture will degrade the salt based piece inside the instrument.
* The instruments controller board has an EPROM with configuration; this configuration file has been saved and is on a floppy as well as being saved on the network share.
+
* The instruments controller board has an EPROM with configuration: [[file:FTIR-Spectrum2000_eprom_config_41618.zip | EPROM configuration file]]
 
=== Computer & Software ===
 
=== Computer & Software ===
 
* Need to get software license key. Software requires license key.
 
* Need to get software license key. Software requires license key.

Revision as of 08:14, 14 May 2013

FT-IR-1.jpg

Fourier transform infrared spectroscopy Wikipedia entry

Manuals

Information Table


Notes


  • DO NOT TURN OFF THE COMPUTER!
  • DO NOT TURN OFF THE INSTRUMENT!
  • If the computer is turned off, the spectrum software will need to be run; do a 'BkGrd' (background scan) from the home screen. This needs to be done every time the computer is turned back on. This will initialize the instrument and put it into a ready state. The Ready green LED light should be on after the instrument has initialized.
  • The [PCI] computer controller board doens't automatically put the instrument into ready mode. Apparently, the ISA controller board does interact with the instrument to initialize it and put it into ready mode.
  • The instrument should be left on so the internal heater can keep the inside of the instrument dry. Internal moisture will degrade the salt based piece inside the instrument.
  • The instruments controller board has an EPROM with configuration: File:FTIR-Spectrum2000 eprom config 41618.zip

Computer & Software

  • Need to get software license key. Software requires license key.
  • Software uses two directories found at the root of the drive: pel_apps & pel_data.
  • Software installation requires the 'mapping' or setting of the transputer I/O address. There's a help document at the root of the drive that explains how to do this.
  • The PC is a candidate to be upgraded, along with upgrading OS to Windows XP; it's likely that the software will not work on Windows 7, but worth testing in vm environment as a quick-and-dirty test. The OS needs to be 32 bit version.
  • The CD drive motor is broken.
  • Will not boot from USB.




back to Main page