Students: Field Supervisor and Sub Contractors

From Help Wiki
Revision as of 12:47, 2 September 2015 by Houstond (Talk | contribs) (Houstond moved page Field Supervisor and Sub Contractors to Student: Field Supervisor and Sub Contractors without leaving a redirect)

The new Individual Study System allows for you to obtain approvals from your Field Supervisor and Sub Contractors online. Please follow the steps below and note that if you are having an issue with your Field Supervisor's online approval, you can always print a paper copy and have it signed.

Selecting A Field Supervisor and Sub Contractor

  • When creating your Internship Contract, under the Sponsor page, click the plus symbol to add a Field Supervisor
  • Fill in all required fields regarding who your Field Supervisor is
  • Remember that the email address you provide for them must be the same email address they will use to login to the approval system when your contract is ready for review.
  • Complete your draft contract by moving on to the next steps

Inviting Field Supervisor or Sub Contractor to Review/Approve Online

  • Once you have completed the prior steps you can invite your Field Supervisor or Sub Contractor to approve online
  • Navigate to the Collect Feedback section of the contract summary page. To the right of "Field Supervisor" there is instruction text for Online and Paper approval
  • Click the Online approval text to bring up the invite window
  • The email address you noted earlier in your contract is listed.
  • Type a message to your Field Supervisor or Sub Contractor and click "send invite"
  • An invite will be sent to the Field Supervisor after a site administrator reviews the request
  • Your Field Supervisor will need to login at collab.evergreen.edu/internships
  • As long as the email you noted for your Field Supervisor matches the one they used to login, they will be granted access to your contract once you've shared it